1. Objective

Outline the failover mechanism in ABB 800xA PM865 controller pairs using Sync Units.

2. Core Components

3. Method

Procedure adapted from official ABB documentation and field observation.

  1. Connect both PM865 CPUs to a shared Sync Unit.
  2. Flash identical control logic using Control Builder.
  3. Monitor heartbeat signal on AC800M bus.
  4. Simulate controller loss and observe failover time.

4. Observations

5. Commentary

This matches vendor expectations. Still pending: testing with different firmware versions.

6. Related Topics